Huawei FusionDC1000A Installation Manual page 48

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 4-10 Securing pre-fab. module bases
Step 7 Level all bases.
1.
2.
3.
Step 8 Insert a twistlock into the mounting hole in a single-capacity base and keep the
lock head in the pre-fab. module length direction.
Step 9 Pre-mount the nuts onto the twistlocks using an adjustable wrench.
Issue 01 (2021-04-20)
Measure the height of each base using the level gauge, and record the height
on its upper surface using the marker.
Identify the base with the highest upper surface, and use it as the adjustment
reference.
Select spacers based on the height difference between a base and the
reference base, and add spacers to adjust the height. Ensure that the height
difference is within 5 mm after adjustment.
Figure 4-11 Installing the washer
(1) Spacer
NO TE
Spacers delivered with the bases have two specifications: 2 mm and 5 mm thick.
Copyright © Huawei Technologies Co., Ltd.
4 Installing a Pre-fab. Module
(2) Base
41