Procedure
Step 1 Move the fire cylinder using a pallet truck to a position near the container door
closest to the installation position.
Do not move the fire cylinder over a long distance by hands.
Step 2 Move the fire cylinder to the installation position and secure it using steel straps.
Keep the pressure gauge panel outwards so that people can view the reading,
which also facilitates later maintenance.
Step 3 Connect the fire cylinder to the fire extinguishing pipeline.
Wrap the threads with sealing tape to ensure air tightness.
1.
2.
3.
Issue 01 (2021-04-20)
NO TICE
NO TICE
NO TICE
Remove the protective cover at the threaded adapter position of the container
valve, and connect the threaded adapter to the fire cylinder, as shown by (1)
in the figure.
Connect the I-shaped connection pipe to the threaded adapter.
Connect one end of the high-pressure hose to the fire cylinder and the other
end to the fire extinguishing pipeline, as shown by (2) in the figure.
Copyright © Huawei Technologies Co., Ltd.
8 Installing Devices Inside the Pre-fab. Module
82

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents