2.2.1 (Optional) Concrete Platform Scenario

2.2.2 Base Installation Scenario

Issue 01 (2021-04-20)
Build concrete platforms on the selected installation site.
Figure 2-1 Concrete platform (unit: mm)
(1) Concrete platform
NO TICE
The minimum cross-sectional area of a concrete platform must be 2900 mm x
1000 mm. The concrete platforms must be 500 mm higher than the ground to
ensure efficient drainage.
Load-bearing capacity of concrete platforms: meets the requirements of the
maximum weight of a pre-fab. module 25,000 kg and NEBS Zone 3
antiseismic requirements.
NO TE
Recommended load-bearing capacity calculation: Maximum weight of a pre-fab.
module 25,000 kg x 3 (NEBS Zone 3 requires amplitude acceleration 3g) x 1.5 (0.5
times the engineering construction error and margin)/Effective support contact area
(The effective contact area in the concrete platform installation scenario is 4 x 272
2
cm
.)
The horizontal error between concrete platforms must be less than 5 mm.
Concrete pads or passages with the load-bearing capacity meeting local civil
work standards can be built on the site outside the concrete platforms for
access and servicing.
Build concrete platforms on the selected installation site.
Copyright © Huawei Technologies Co., Ltd.
(2) Ground
2 Site Requirements
(3) Angle steel
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents