Huawei FusionDC1000A Installation Manual page 56

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 5-1 Composition of the external cable tray
(1) Long cable tray
(4) M10 bolt assemblies
Procedure
Step 1 Locate the external cable tray installation position, and remove the rubber plugs
from the corresponding mounting holes in the pre-fab. module using a Phillips
screwdriver.
Step 2 Secure the short cable tray to the ports reserved on the pre-fab. module.
Issue 01 (2021-04-20)
(2) Short cable tray
(5) M8 bolt assemblies
Copyright © Huawei Technologies Co., Ltd.
5 Installing External Accessories for the Pre-fab.
(3) Fastener
Module
49