Huawei FusionDC1000A Installation Manual page 65

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 6-1 Opening the compartment door of the smart cooling product on the
right
Step 3 Install the pipes.
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
6 Installing External Pipes for Smart Cooling
Products
58

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents