Figure A-5 DPJ end connector
(1) Body
(3) Guarding
(5) Plastic-coated metal hose
Preparations
Tools: small cutter, scissors, wrench dedicated for feeder windows, glue gun
Material: sealant
Skill requirement: skilled technician
Procedure
Step 1 Cut the plastic-coated metal hose to facilitate connection between the metal hose
and the ferrule.
1.
2.
Step 2 Remove the sealant from the DPJ end connector.
Step 3 Remove the cover lock nut, guarding, and ferrule from the DPJ end connector
using the feeder window wrench shipped with pre-fab. modules.
Step 4 Place the cover lock nut and guarding along a cable into the plastic-coated metal
hose.
Issue 01 (2021-04-20)
Use a small cutter or a pair of scissors to cut the hose at the joint between
the plastic-coated metal hose and the end connector at an angle of 30 to 45
degrees.
Figure A-6 Cutting a hose
Trim any burrs on the cut.
Copyright © Huawei Technologies Co., Ltd.
A Basic Installation Operations
(2) Ferrule
(4) Cover lock nut