Hoisting The Pre-Fab. Module - Huawei FusionDC1000A Installation Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Procedure
Step 1 Cut open the protective cover using a utility knife and remove the protective cover.
----End

4.1.3 Hoisting the Pre-fab. Module

Prerequisites
To facilitate subsequent installation, ensure that the pre-fab. module is level after
hoisting.
Context
The crane and steel ropes must meet the pre-fab. module hoisting requirements.
Table 4-1 Parameters for hoisting a pre-fab. module
Weight
Net weight: <
14,000 kg
Hoisting Precautions
Stage
Before hoisting
Issue 01 (2021-04-20)
NO TE
When removing the protective cover, take protective measures for working at heights.
NO TICE
Select an appropriate crane based on standards of the crane company, and
ask a professional to assess the crane onsite.
The hoisting ropes are available.
The positions of pre-fab. module corner fittings are correctly marked.
The doors of the pre-fab. module to be hoisted are closed.
The weather is good without wind when a pre-fab. module needs to be
hoisted outdoors.
Steel Rope
Length
> 12.5 m
Precautions
Ensure that the crane and steel ropes provide the required
bearing capacity.
Ensure that the steel ropes are securely connected.
Copyright © Huawei Technologies Co., Ltd.
4 Installing a Pre-fab. Module
Steel Rope
Dimensions (H x W x D)
Quantity
4 PCS
2896 mm x 2438 mm x 12192
mm
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents