3.2 Installation Personnel Requirements

● Common technician: familiar with the equipment installation process.
● Skilled technician: familiar with the equipment installation process and having an electrician
certificate.
Issue 01 (2021-04-20)
Model/Function
M12x30 stainless steel bolt assembly
● Diameter: 50 mm; radial shrinkage: 50%;
operating temperature range: 55°C to 105°C
● Connects mains input power cables.
The SIM card is installed in a card slot in the
ECC800-Pro main control module. The SIM card
must support GSM and WCDMA.
The microSD card is installed in a card slot in the
ECC800-Pro main control module. The capacity
ranges from 16 GB to 128 GB. The recommended
capacity is 32 GB.
NO TE
● This table may not list some tools required at specific sites. Onsite installation personnel
and technical support personnel should prepare tools based on site requirements.
● Some dedicated tools and installation materials provided with the equipment may not
be listed in this table.
● Preventive measures should be applied before installation to avoid water seepage into
pre-fab. modules and equipment in the case of a sudden change in the weather.
Installation personnel must be trained and qualified by Huawei to master
methods for system installation, and must obtain work permits before they
begin to install the equipment.
Technical personnel from the customer must be trained by Huawei and
master the installation method.
The number of construction personnel depends on the project progress and
installation environment.
Construction personnel have read through the safety precautions and related
product documents before they begin working.
NO TE
Copyright © Huawei Technologies Co., Ltd.
3 Installation Preparations
Quantity
Configure 1
PCS for each
ground point.
Colors subject
to local
regulations,
10 m long for
each
1 PCS
1 PCS
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents