2.
3.
Step 2 Remove the transport fasteners on the top of the UPS cabinet and SmartLi.
1.
2.
3.
4.
Issue 01 (2021-04-20)
Figure 7-7 Removing the side panels for sealing plates
Remove the transport fasteners from the cabinets and smart cooling products.
Reinstall the side panels for sealing plates and the rubber plugs.
Remove the rubber plugs from the top of the sealing plates.
Remove the front sealing plates using a screwdriver.
Remove the transport fasteners from the top of cabinets.
Reinstall the sealing plates and rubber plugs.
Copyright © Huawei Technologies Co., Ltd.
7 Removing Transport Protection Materials