FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
3.3 Checking the Installation Environment
Check the site requirements one by one, and start installation only after all
requirements are met. Huawei will not be liable for any consequences caused if
the installation environment does not meet the requirements.
Issue 01 (2021-04-20)
NO TE
Mark the security zone: Use red caution belts to delimit a security zone, clean up obstacles
in that zone, and place construction signs and warning signs in eye-catching positions.
Copyright © Huawei Technologies Co., Ltd.
3 Installation Preparations
29