4.2.1 Determining the Pre-fab. Module Installation Position

Prerequisites
Concrete platform levelness is critical to pre-fab. module installation. Ensure that
the concrete platform meet requirements before installing pre-fab. module bases.
Context
Before installing a pre-fab. module, determine its installation position and
direction based on site space.
Figure 4-6 Single-capacity base (unit: mm)
Preparations
Tools: torque wrench, adjustable wrench, level, level gauge, hammer drill, right
angle, marker, ink fountain, long leather measuring tape, claw hammer, vacuum
cleaner
Materials: single-capacity base (4 PCS), twistlock, expansion bolt, spacer
Skill requirement: skilled technician
Procedure
Step 1 Determine the installation areas on the concrete platforms, and the actual site
space. Mark the installation areas on the concrete platforms using an ink fountain.
Issue 01 (2021-04-20)
The field meets site requirements.
Before installing a pre-fab. module, check the height of concrete platforms
and ensure that the height (altitude) error between the upper surfaces of all
platforms does not exceed 5 mm.
CA UTION
Copyright © Huawei Technologies Co., Ltd.
4 Installing a Pre-fab. Module
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents