Huawei FusionDC1000A Installation Manual page 94

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 8-24 Positions of the fire cylinder steel straps
(1) Fire cylinder steel straps
Step 4 Install the threaded adapter and high-pressure hose.
Install the threaded adapter and then the high-pressure hose.
Wrap the threads with sealing tape to ensure air tightness.
Issue 01 (2021-04-20)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
8 Installing Devices Inside the Pre-fab. Module
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents