Huawei FusionDC1000A Installation Manual page 69

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 7-3 Removing the liquid level detector fasteners
Step 4 Reinstall the water pan cover.
Step 5 Verify the connection of the interconnection terminal of the low liquid level
detector.
Figure 7-4 Connect the interconnection terminal.