FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Before the installation, unpack and check the products, take out auxiliary
materials (for details, see the packing list) from the cabinets, make available all
required technical documents, tools, and materials, check the installation
environment, drill holes based on the installation positions, fix the pre-fab. module
bases, and train onsite installation personnel.
3.1 Obtaining Tools and Materials
Table 3-1 Tools and materials
Catego
Tighteni
ng tools
Issue 01 (2021-04-20)
3
ry
Phillips screwdriver
(M5, M6, and M8)
Phillips screwdriver
M8 (length = 200
mm)
Copyright © Huawei Technologies Co., Ltd.
Installation Preparations
Tools and Materials
Flat-head screwdriver
(2–5 mm)
Solid wrench
3 Installation Preparations
Phillips screwdriver
M4 (length < 100
mm)
Adjustable wrench
23