Inspection Procedure - GE N60 Instruction Manual

Network stability and synchrophasor measurement system ur series
Hide thumbs Also See for N60:
Table of Contents

Advertisement

1.1 IMPORTANT PROCEDURES
1
1.
Open the relay packaging and inspect the unit for physical damage.
2.
View the rear nameplate and verify that the correct model has been ordered and delivered. The model number is at the
top right.
3.
Ensure that the following items are included:
• Instruction manual (if ordered)
• GE EnerVista™ DVD (includes the EnerVista UR Setup software and manuals in PDF format)
• Mounting screws
4.
If there is any noticeable physical damage, or any of the contents listed are missing, contact GE Digital Energy as fol-
lows.
GE DIGITAL ENERGY CONTACT INFORMATION AND CALL CENTER FOR PRODUCT SUPPORT:
GE Digital Energy
650 Markland Street
Markham, Ontario
Canada L6C 0M1
TELEPHONE:
FAX:
E-MAIL:
HOME PAGE:
For updates to the instruction manual, firmware, and software, visit the GE Digital Energy website.
1-2
Figure 1–1: REAR NAMEPLATE (EXAMPLE)
Worldwide +1 905 927 7070
Europe/Middle East/Africa +34 94 485 88 54
North America toll-free 1 800 547 8629
+1 905 927 5098
Worldwide multilin.tech@ge.com
Europe multilin.tech.euro@ge.com
http://www.gedigitalenergy.com/multilin
N60 Network Stability and Synchrophasor Measurement System
1 GETTING STARTED

1.1.2 INSPECTION PROCEDURE

GE Multilin

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents