Chapter 2 Installation; Receiving Your Products - Visual Inspection; Pre-Installation Check; Warranty Claims - GE 90-30 PLC Series Installation And Hardware Manual

Hide thumbs Also See for 90-30 PLC Series:
Table of Contents

Advertisement

Installation
Chapter
2
This chapter discusses installation details only. Other information about the products such as
hardware descriptions and specifications, is covered in the applicable chapters.

Receiving your Products - Visual Inspection

When you receive your Series 90-30 PLC system, carefully inspect all shipping containers for
damage that may have occurred during shipping. If any part of the system is damaged, notify the
carrier immediately. The damaged shipping container should be saved as evidence for inspection
by the carrier.
As the consignee, it is your responsibility to register a claim with the carrier for damage incurred
during shipment. However, GE will fully cooperate with you if such action is necessary.

Pre-installation Check

After unpacking Series 90-30 PLC racks, cables, modules, etc., record all serial numbers. Serial
numbers are printed on the module packaging. Serial numbers are required to make a claim during
the warranty period of the equipment. All software product registration cards should be completed
and returned to GE. See "Module Features" in this chapter for location of module serial
numbers. See "Common Baseplate Features" in chapter 3 for location of baseplate serial numbers.
You should verify that all components of the system have been received and that they agree with
your order. If the parts received do not agree with your order, call Programmable Control
Customer Service at 1-800-433-2682. A Customer Service representative will provide further
instructions.

Warranty Claims

Record the serial number of the defective item and contact your distributor for instructions.
GFK-0356Q
Series 90-30 PLCs must be mounted in a protective enclosure.
The installation instructions described in this chapter apply to PLC installations
that do not require special procedures for noisy or hazardous environments. For
installations that must conform to more stringent requirements (such as CE
Mark), see GFK-1179, Installation Requirements for Conformance to
Standards. Also see GFK-0867, GE Product Agency Approvals,
Standards, General Specifications.
Important Note
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents