GE N60 Instruction Manual page 422

Network stability and synchrophasor measurement system ur series
Hide thumbs Also See for N60:
Table of Contents

Advertisement

9.2 BATTERIES
b) REPLACE BATTERY FOR SH/SL POWER SUPPLY
When required, the battery can be replaced. The power supply module contains the battery.
To avoid injury, ensure that the unit has been powered off for a minimum of three minutes
before replacing the battery.
Risk of fire if battery is replaced with incorrect type or polarity.
To replace the battery:
1.
Turn off the power to the unit.
2.
Wait a minimum of three minutes to ensure that there is no power to the battery.
3.
As outlined in the previous section, open the unit by sliding up the plastic latch on the right side of the front panel (stan-
dard front panel) or unscrewing the panel (enhanced front panel).
For the standard front panel, it
4.
the first slot on the left side and blocked by the hinge of the front panel. To remove the front panel, unscrew the bracket
on the front left side of the unit.
5.
Simultaneously pull the ejector clips at the top and bottom of the power supply module and remove the module.
6.
Unscrew all four screws (not three) that attach the metal cover to the module.
7.
Slide the metal cover away from the clips about 1 cm (1/4 inch) and remove the cover.
8.
Unclip the black plastic holder that keeps the battery in place. The plastic clips into the socket at the bottom on both
sides. Use a flat-head screwdriver if you cannot unclip the plastic with your fingers.
9.
Observe the + and - polarity of the battery and replace it with the same polarity as marked on the battery holder.
Replace the battery with the identical make and model. For example, do not use a rechargeable battery.
10. Reinstall the battery clip and the metal cover, and reinsert the power supply module into the unit.
11. Power on the unit.
9
12. Dispose of the old battery as outlined in the next section.
9-4
needs to be removed in order to access the power supply module, which is typically in
Figure 9–4: BATTERY LOCATION ON SH/SL POWER SUPPLY MODULE
N60 Network Stability and Synchrophasor Measurement System
9 MAINTENANCE
GE Multilin

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents