Chapter 11: Hd-Series Quick-Start Guide; General; Unpacking; Connections - Honeywell MAXPRO-Net Hardware Installation Manual

Crosspoint matrix video switching system
Hide thumbs Also See for MAXPRO-Net:
Table of Contents

Advertisement

11.1 GENERAL

Your MAXPRO-Net HD Series video switching equipment is shipped to you pre-
assembled and pre-configured (where possible). To assist you in obtaining maximum
functionality within the minimum time, we have provided the following Quick-Start
instructions.

11.2 UNPACKING

a) Remove your MAXPRO-Net HD Series equipment from its packaging and install it
according to good engineering practice.
b) Remove the MX-32128 metal front panel and cardboard support (where fitted) then
replace the front panel.

11.3 CONNECTIONS

a) Connect the mains power lead(s) to your System Controller and System Power
Supply. Ensure the mains voltage settings are correct.
b) Connect the supplied power cable between the MX-32128 subrack and your System
Controller or MX-PS9 System Power Supply.
c) Connect the subrack data cable from the MX-32128 subrack to Port 1 of your
System Controller.
d) Connect a BNC patch cable from the menu output of your System Controller to the
last video input connector on your MX-32128 subrack.
e) Connect a monitor(s) to the video output connectors of your MX-32128 subrack.
f)
Connect both the RD-500/530 and 'qwerty' keyboards to your System Controller.
g) Connect video source cables to the inputs of your MX-32128 subrack.
Rev. C
CHAPTER 11:
HD-SERIES
QUICK-START GUIDE
11-1
HMXMU001018
10/06

Advertisement

Table of Contents
loading

Table of Contents