Honeywell MAXPRO-Net Hardware Installation Manual page 145

Crosspoint matrix video switching system
Hide thumbs Also See for MAXPRO-Net:
Table of Contents

Advertisement

7.15.11
Workshop Test Mode, Continued.
TEST LEVEL (2)
TEST LEVEL (3)
This test echoes SW1 (4 way) DIP switch to the LEDs (1 to 4 only). Again, each DIP
switch can be verified to operate properly.
TEST LEVEL (4)
This test enables ALL alarm inputs. By setting SW1 DIP switch to it's various modes (as
per the tables above), the correct operation of all alarm inputs can be verified. Alarm
ACTIVE/CLEAR data is also generated on the subrack BUS, thus generating a MAX
PROTOCOL alarm command from the RD105 subrack controller to the MAXPRO-Net
system.
TEST LEVEL (5)
This test automatically tests memory in the E2PROM used for storing USER DEVICE
DATA. Beginning from the bottom LED the E2PROM is completely filled with a specific
byte pattern. As the column of LED's decreases every location is read and verified. This
test will cycle. If an error is detected in the memory, all LED's will flash continuously,
halting this test level.
TEST LEVEL (6)
This is the (Infrared) PPM test mode. Similar to the IR Learn mode, this test mode
begins by ANALYSING the first (2) keypresses from the IR remote control. Once this is
done, the following keypresses are read and re-written out of a PPM output (selected by
SW1) for direct equipment control verification. Pressing the LEARN BUTTON will restart
TEST LEVEL (6).
Rev. C
NOTE: This test echoes SW2 (8 way) DIP-switch to the
LEDs. Each DIP-switch can be verified to operate
properly.
7.15-11
HMXMU001018
10/06

Advertisement

Table of Contents
loading

Table of Contents