Q12Dccpu-V - Mitsubishi Electric MELSEC Q Series User Manual

Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

5.4

Q12DCCPU-V

The following explains the start-up procedure for Q12DCCPU-V.
Module mounting
Check field
Mount the power supply module and the C Controller module on the base unit.
Power supply module
• Mounting on the base unit
• Power supply wiring
C Controller module
• Battery Installation
Initialization of C Controller module
Initialize the C Controller module.
Select the following mode and perform the initialization.
• Mode "12" module initialization setting (Extended mode)
Hardware Diagnostics
Check the status of the C Controller module hardware.
Module mounting
Install the module to the base unit.
• CPU module (for multiple CPU system configuration)
• I/O module, intelligent function module and network module
Wiring and connection
Arrange wiring:
• Extension cable connection to the extension base unit and base number setting
• Wiring for external device(s) connected to each module
• Wiring between network modules
Initial setting of modules
Set each module switch.
• Set the RUN/STOP/MODE switch on the C Controller module to STOP.
• Set the RUN/STOP/RESET switch on each CPU module to STOP.
• Set the intelligent Function module and network module switches.
60
Start
To the next page
$QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
 Page 116, CHAPTER 8
 Page 62, Section 6.1
 Page 75, Section 6.5
$QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
$Manual for respective module
$QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
$Manual for respective module
 Page 35, CHAPTER 2

Advertisement

Table of Contents
loading

Table of Contents