ABB IRC5 Product Manual page 140

Hide thumbs Also See for IRC5:
Table of Contents

Advertisement

2 Installation and commissioning
2.9.7 Installing the EPS board DSQC 646 for Electronic Position Switches
Continued
Procedure
The procedure below details how to install an EPS board.
1
2
3
4
Continues on next page
140
Action
DANGER
Before commencing any work inside the
cabinet, please observe the safety inform-
ation in section
Make sure that the main
power has been switched off on page
WARNING
The unit is sensitive to ESD. Before
handling the unit please read the safety
information in the section
sensitive to ESD on page 34
If not already in place, fit the EMC strips
on the EPS board.
Connect the short SMB cable and both
Ethernet cables to the EPS board before
mounting the board. These connections
may be difficult to reach once the board
is mounted.
The two Ethernet connectors on the EPS
board are interchangeable (it does not
matter which is connected to the main
computer and which is connected to the
axis computer).
© Copyright 2004-2018 ABB. All rights reserved.
Note/illustration
26.
The unit is
A
xx0700000087
xx0600003303
Product manual - IRC5
3HAC047136-001 Revision: M

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents