New Field In Worklist Setup; R5.1.1 And Earlier; R5.1.2 And Later - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

PROPRIETARY TO GE
D
5180483-100, R
. 7
LOGIQ E9 P
S
M
IRECTION
EV
ROPRIETARY
ERVICE
ANUAL
3-9-7
DICOM Worklist Service (cont'd)
Table 3-19

New Field in Worklist Setup

R5.1.1 and earlier

R5.1.2 and later

Verify Before Query: If the LOGIQ E9 attempts a Query to a service that does not respond, the
scanner will wait for a period determined by the Timeout and Maximum Retries settings. During this
period user input is disabled. To avoid this, checkmark Verify Before Query. Then the scanner will first
verify that the service will respond, and wait no longer than "Verify Timeout" seconds. If the service
fails to respond in that time, the LOGIQ E9 will not attempt the Query.
3 - 64
Section 3-9 - Connectivity Setup and Tips

Advertisement

Table of Contents
loading

Table of Contents