Power On/Boot Up; Detailed Procedure; Warnings - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

D
5180483-100, R
IRECTION
3-6-8

Power On/Boot Up

3-6-8-1

Warnings

ALWAYS CONNECT THE UNIT TO A FIXED POWER SOCKET WHICH HAS THE
DANGER
PROTECTIVE GROUNDING CONNECTOR.
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
DANGER
SAFETY GROUND.
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
DANGER
POWER PLUG IS THE PROPER HOSPITA L-GRADE TYPE (WHERE REQUIRED).
LOGIQ E9 REQUIRES ALL COVERS
CAUTION
OPERATE THIS UNIT ONLY WHEN ALL BOARD COVERS AND FRAME PANELS ARE
SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD LOGIQ E9
PERFORMANCE AND COOLING PURPOSES.
Use only power supply cords, cables and plugs provided by or designated by GE.
NOTICE
NOTE:
Do not cycle the Circuit Breaker ON-OFF-ON in less than five seconds. When turning OFF the
Circuit Breaker, WAIT until the ON/OFF button is no longer lit. The LOGIQ E9 should de-
energize completely before turning the circuit breaker ON.
3-6-8-2

Detailed Procedure

For a detailed procedure, see:
3 - 24
PROPRIETARY TO GE
. 7
EV
4-2-3 "Power ON/Boot Up" on page
Section 3-6 - Completing the setup
LOGIQ E9 P
ROPRIETARY
4-3.
S
M
ERVICE
ANUAL