Site preparations
Section 2-1
Overview
2-1-1
Purpose of this chapter
This chapter provides the information required to plan and prepare for the setup of a LOGIQ E9.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the LOGIQ E9.
2-1-2
Contents in this chapter