Huawei FusionModule500 User Manual page 74

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
Figure 2-55 Placing a VCN540
Step 5 Put two M6 screws through the slotted holes of one mounting ear and use a Phillips
screwdriver to fasten the screws to secure the device to the rack rail at front of the network
cabinet.
Figure 2-56 Securing a VCN540
----End
Issue 07 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
2 Installation
65

Advertisement

Table of Contents
loading

Table of Contents