(1) Correct location
(4) Incorrect location
3.
Issue 07 (2019-12-20)
Figure C-4 Placing the cabinet on the spandrel girder or near the bearing wall
If the static load bearing capacity of the raised floor is insufficient, install bases under the
raised floor whose height ranges from 200 mm to 1200 mm.
Figure C-5 Bases for the raised floor
If the static load bearing capacity of the raised floor is insufficient, install a base between
the cabinet and the floor, as shown in
must be greater than 60 mm x 25 mm but smaller than that of the cabinet. Weld steel
square bars to make a base, and secure the base to the cabinet using four bolts.
C-7
and
Figure C-7
show the distance between bolts.
Copyright © Huawei Technologies Co., Ltd.
(2) Spandrel girder
Figure
C-6. The dimensions (L x W) of the base
C Bearing Capacity Assessment
(3) Bearing wall