Huawei FusionModule500 User Manual page 7

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
2.2.7.4 (Optional) Installing the Infrared Remote Control Module .................................................................................. 54
2.2.7.5 (Optional) Installing the Pad ................................................................................................................................. 54
2.2.7.6 (Optional) Installing the Micro SD Card .............................................................................................................. 57
2.2.7.7 (Optional) Installing the WiFi Converter .............................................................................................................. 57
2.2.7.8 (Optional) Installing a SIM Card .......................................................................................................................... 58
2.2.7.9 (Optional) Installing a LAN Switch ...................................................................................................................... 58
2.2.7.10 (Optional) Installing a Server .............................................................................................................................. 59
2.2.7.11 (Optional) Installing a VCN500 .......................................................................................................................... 61
2.2.7.12 (Optional) Installing the VCN540 ....................................................................................................................... 62
2.2.7.13 (Optional) Installing an Independent Deployment AI/DI Unit ........................................................................... 66
2.2.7.14 (Optional) Installing a Door Status Sensor ......................................................................................................... 67
2.2.7.15 (Optional) Installing a T/H Sensor ...................................................................................................................... 68
2.2.7.16 (Optional) Installing BIMs and CIMs ................................................................................................................. 71
2.3 Installing Cables ......................................................................................................................................................... 75
2.3.1 Cable Routes ............................................................................................................................................................ 75
2.3.2 Cable Connections to the Power Supply and Distribution System .......................................................................... 76
2.3.2.1 Connecting Ground Cables ................................................................................................................................... 76
2.3.2.2 Connecting the Mains Power Cable (Single-Phase 220 V Power System) ........................................................... 78
2.3.2.3 Connecting the Mains Power Cable (Dual-Live Wire 208 V Power System) ...................................................... 78
2.3.2.4 (Optional) Connecting an rPDU Power Cable ...................................................................................................... 79
2.3.2.5 (Optional) Installing Battery Strings ..................................................................................................................... 81
2.3.2.6 (Optional) Connecting Cables Between Battery Packs and the UPS .................................................................... 85
2.3.3 Cable Connections to the Monitoring System ......................................................................................................... 86
2.3.3.1 ECC800e Ports ...................................................................................................................................................... 86
2.3.3.2 (Optional) Connecting a Monitoring Cable to the Door Status Sensor ................................................................. 90
2.3.3.3 (Optional) Connecting a Monitoring Cable to the T/H Sensor ............................................................................. 92
2.3.3.4 (Optional) Connecting the Infrared Remote Control Module Cable ..................................................................... 93
2.3.3.5 (Optional) Connecting LAN Switch Cables ......................................................................................................... 94
2.3.3.6 Connecting VCN Cables ....................................................................................................................................... 95
2.3.3.8 (Optional) Connecting Cables to a CIM ............................................................................................................... 96
2.4 Checking After Installation ......................................................................................................................................... 98
2.4.1 Checking the cabinet installation ............................................................................................................................. 98
2.4.2 Checking Installation Environment ......................................................................................................................... 99
2.4.3 Checking Electrical Connections ............................................................................................................................. 99
2.4.4 Checking Cable Installation ................................................................................................................................... 100
2.4.5 Checking monitoring device settings ..................................................................................................................... 100
3 Commissioning Guide ............................................................................................................. 101
3.1 Power-On Commissioning for the Power Supply and Distribution System ............................................................. 101
Issue 07 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
Contents
vi

Advertisement

Table of Contents
loading

Table of Contents