Checking After Installation; Checking The Cabinet Installation - Huawei FusionModule500 User Manual

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
Table 2-12 Port mapping between the CIM and the BIB
Mapping Between the BCB_1 Ports on the CIM and the Signal Ports on the BIB
OL
STA
DRV
GND
Step 3 Connect the CIM communications cable.
Step 4 Connect the CIM power cable.
----End

2.4 Checking After Installation

2.4.1 Checking the cabinet installation

Table 2-13 Checking the cabinet installation
No.
01
02
03
04
05
06
07
08
Issue 07 (2019-12-20)
In the scenario with a battery cabinet, connect one end of the straight-through cable to
the POE port on the CIM, and the other end to the LAN port on the ECC800e.
In the scenario with two battery cabinets, connect one end of the straight-through cable
to the POE port on the CIM, and the other end to the ports 3 and 4 on the LAN switch.
In the scenario with a battery cabinet, connect one end of the power cable to the 12 V/2 A
port on the CIM, and the other end to the DO port on the ECC800e.
In the scenario with two battery cabinets, do not need to perform this step.
Check That
The system configuration, including model and number of modules,
complies with the contract.
The cabinet layout position is consistent with the equipment room layout
diagram.
All bolts are tightened, especially the bolts used for electric connection.
Flat washers and spring washers are installed properly.
The cabinet is clean, without dust or sundries.
The paint on the cabinet exterior is intact. The paint on the cabinet exterior
is intact. If paint flakes off, repaint that area to avoid corrosion.
The cabinet door and lock work properly.
Cable labels are correct, clear, and complete.
All devices installed in cabinets are secured and screws on device
Copyright © Huawei Technologies Co., Ltd.
OL_5
STA_6
DRV_7
GND_8
2 Installation
98