FusionModule500 Smart Mini Data Center
User Manual (ECC800e)
Step 3 Install the mounting ears delivered with the LAN switch and secure the LAN switch to the
rack rails in the front of the cabinet, as shown in
Figure 2-46 Installing a LAN switch
Step 4 Connect the LAN switch power cable to the rPDU.
----End
2.2.7.10 (Optional) Installing a Server
Context
The following installation procedure uses an RH2288 V2 server as an example. For more
information, see the documents delivered with the server.
Procedure
Step 1 Install guide rails, as shown in
Issue 07 (2019-12-20)
This section describes only the installation method. The actual product appearance prevails.
The positions of power cable ports vary depending on the LAN switch models. Connect the power cable
based on the actual power port of the LAN switch.
Copyright © Huawei Technologies Co., Ltd.
Figure
Figure
2-47.
2-46.
2 Installation