Knock the expansion bolts into the holes until the expansion tube completely fits into the hole.
The expansion sleeves must be completely buried under the ground to facilitate subsequent
installation.
Figure 2-16 Installing expansion bolts (unit: mm)
1.
2.
3.
4.
Step 3 Slide the cabinet on its castors to the installation position.
Step 4 Remove the ground cables from the front and rear cabinet doors. Then remove the front and
rear cabinet doors, left and right side panels, as well as the door status on the rear door of the
Converged Cabinet.
Step 5 Install L-shaped ground fasteners at the bottom of the cabinet front and rear.
1.
2.
3.
Issue 07 (2019-12-20)
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Remove the door sill from the bottom of the cabinet.
The removed door sill will no longer be used. Handle it properly.
Install L-shaped ground fasteners, as shown by (1) and (2) in
Install screws for securing the cabinet, as shown by (3) in
Copyright © Huawei Technologies Co., Ltd.
2 Installation
Figure
2-17.
Figure
2-17.
37