Connection Procedure - ABB ACS355 series User Manual

Hide thumbs Also See for ACS355 series:
Table of Contents

Advertisement

Connection procedure

1. Remove the terminal cover by simultaneously pushing the recess and sliding the
cover off the frame.
2. Analog signals: Strip the outer insulation of the analog signal cable 360 degrees
and ground the bare shield under the clamp.
3. Connect the conductors to the appropriate terminals. Use a tightening torque of
0.4 N·m (3.5 lbf·in).
4. Twist the grounding conductors of each pair in the analog signal cable together
and connect the bundle to the SCR terminal (terminal 1).
5. Digital signals: Strip the outer insulation of the digital signal cable 360 degrees
and ground the bare shield under the clamp.
6. Connect the conductors of the cable to the appropriate terminals. Use a tightening
torque of 0.4 N·m (3.5 lbf·in).
7. For double-shielded cables, twist also the grounding conductors of each pair in
the cable together and connect the bundle to the SCR terminal (terminal 1).
8. Secure all cables outside the drive mechanically.
9. Unless you need to install the optional fieldbus module (see section
optional fieldbus module
10. Connect STO conductors to the appropriate terminals. Use a tightening torque of
0.4 N·m (3.5 lbf·in).
on page 38), slide the terminal cover back in place.
2
1
Electrical installation 57
Attach the
3
4
6
2
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents