3900 Series Multi-Mode Base Station
Commissioning Guide
For details about each status, see

Table 5-3 Description of the commissioning statuses

Status
----End

5.6.2 Viewing NodeB Alarms

After the NodeB software is upgraded automatically during the NodeB commissioning, you can
view the alarms of this NodeB and the relevant alarms of the RNC managing this NodeB through
the M2000. All the alarms related to the NodeB are categorized according to objects. This helps
you query required alarms. In addition, the M2000 provides the function of automatically
diagnosing NodeB board alarms, NodeB antenna alarms, and E1T1 alarms. You can take
corresponding measures to rectify the faults based on the diagnosis results.
Context
According to objects, alarms are categorized into physical transmission port alarms, transmission
path alarms, antenna alarms, board alarms, cell alarms, external alarms, and other alarms. Other
alarms refer to the alarms that cannot be categorized on the basis of specific objects.
Issue 02 (2010-07-30)
TIP
You can use either of the following methods to quickly view the NodeB commissioning status:
Click the table heading field of the task list to sort the commissioning tasks.
l
Click
next to the table heading field of the task list to set the filtering condition. The task list displays
l
only the tasks that meet the filtering condition. If no filtering condition is set, the list of commissioning
tasks displays all the tasks that you are authorized to view.
Select a field in the task list, click
condition in the displayed dialog box.
Operation
Start a NodeB commissioning task.
The commissioning is abnormal. In this case, you can view the alarm
information and then perform fault diagnosis and alarm handling in
time.
Pay attention to the commissioning. For example, an exception occurs
in a certain procedure, which does not affect the commissioning and
need not be handled.
No operation needs to be performed. The commissioning is being
performed normally.
You need to confirm whether to complete the commissioning.
The commissioning is complete without errors.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Commissioning the MBTS in GL or UL Mode on the
, and then select Custom from the drop-down list. Set the filtering
Table
5-3.
M2000
5-29