6.2 Preparing the USB Disk for Local Commissioning

The USB disk should be ready before it is used for local commissioning. The preparation of the
USB disk for local commissioning varies according to the base station mode. Therefore, you
must prepare the USB disk based on the mode of the base station to be commissioned.
Context

6.2.1 Arranging the USB Disk for Local GBTS Commissioning

The USB disk should be ready before it is used for local GBTS commissioning.
6.2.2 Arranging the USB Disk for Local NodeB Commissioning
The USB disk should be ready before it is used for local NodeB commissioning.
6.2.3 Arranging the USB Disk for Local eNodeB Commissioning
Before the local eNodeB commissioning through the USB storage device, you need to save the
required files in a specified directory in the USB storage device.
6.2.4 Configuring the Security Equipment
When the security gateway (GW) is deployed in the network, you need to configure data for the
security GW. In the case that the IEEE 802.1x authentication is adopted, the authentication access
equipment and the authentication server should be configured. Generally, an authentication
server is the Authentication, Authorization and Accounting (AAA) server.
6.2.1 Arranging the USB Disk for Local GBTS Commissioning
The USB disk should be ready before it is used for local GBTS commissioning.
Issue 02 (2010-07-30)
and rectify faults (if any). For details, see
Transmission.
5.
The M2000 automatically commissions the MBTS. For details, see
Commissioning the MBTS on the
commissioning, monitor the commissioning progress and alarms, and rectify faults (if
any). The monitoring operations vary according to modes. for details on the operations
in each mode, see
the NodeB Commissioning
Task.
6.
Obtain the commissioning report from the M2000. For details, see
Commissioning
7.
View the commissioning report to check the MBTS operating status. For details, see
5.9 Checking the Operating Status of the Base
8.
Verify eNodeB services. For details, see
eNodeB.
9.
Confirm the MBTS commissioning task. For details, see
Commissioning
NOTE
Files required for both modes must be saved to the USB disk when base stations supporting two modes are
deployed.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning the MBTS by Using USB and M2000
M2000. During the process of the MBTS
5.5 Monitoring the GBTS Commissioning
Task, and
5.7 Monitoring the eNodeB Commissioning
Report.
Task.
5.3 Intervening the GBTS
Task,
Station.
5.10 Testing the Basic Services of the
5.11 Confirming the
5.4
5.6 Monitoring
5.8 Obtaining the
6-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents