The hardware connections are
correct.
Site management rights are
released.
The transmission between the BBU and the
BSC is available.
Remote
The transmission between
Commiss
BBU and MRFU, BBU and
ioning
RRU3908, and BBU and BSC
are normal.
The transmission between the
cascaded GBTSs is normal.
The transmission between the
GBTSs in ring topology is
normal.
The board configuration is
correct and the boards are
working properly.
The active software version is
correct.
The hardware installation and
the data configuration are
consistent with each other.
No alarm related to the GBTS
is reported.
The CS service test is
successful.
The PS service test is
successful.
The environment monitoring
alarm can be reported
normally.
The VSWR is correct. Record
the value of the VSWR.
The output power of the TRX
is normal. Record the value of
the output power per carrier.
The antenna system is properly
connected.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
7-43