Table 7-7 Data Sheet For Enodeb Commissioning - Huawei 3900 Series Commissioning Manual

Multi-mode base station
Hide thumbs Also See for 3900 Series:
Table of Contents

Advertisement

7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000

Table 7-7 Data sheet for eNodeB commissioning

Site
Name
eNodeB
Type
ESN
Commiss
ion Time
Commiss
ioning
Engineer
Commiss
ioning
Result
Commissioning Item
Commiss
ioning
Preparati
on Phase
Remote
Commiss
ioning on
the
M2000
7-46
□ Successful □ Failed
Faults in the eNodeB hardware
installation are rectified.
The transmission links between
the S1 port and X2 port are
ready.
Negotiation data of the eNodeB
to be commissioned is added to
the MME/S-GW.
Software and data configuration
file are ready.
Local
The information
end of
regarding the eNodeB,
the
such as name, ID, and
eNod
ESN, is reported.
eB
The eNodeB is
powered on.
Remo
The ESN is bound.
te end
of the
The software and data
eNod
configuration file are
eB
loaded through the
M2000.
The software is
upgraded to the target
version.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3900 Series Multi-Mode Base Station
Conclusion
Handling Exceptions
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
□ Yes; □
No
Commissioning Guide
Issue 02 (2010-07-30)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents