Parameters Of The Performance Counters For Gbts Service Verification; Figure 5-15 Page Of Details Of A Gbts In The Commissioning Report (2); Table 5-10 Page Of Details Of A Gbts In The Commissioning Report (2) - Huawei 3900 Series Commissioning Manual

Multi-mode base station
Hide thumbs Also See for 3900 Series:
Table of Contents

Advertisement

5 Commissioning the MBTS in GL or UL Mode on the
M2000

Figure 5-15 Page of details of a GBTS in the commissioning report (2)

Table 5-10 Page of details of a GBTS in the commissioning report (2)

No.
1
2
5.12.4 Parameters of the Performance Counters for GBTS Service
Verification
This section describes the parameters of the performance counters that are monitored in the
service verification procedure during GBTS commissioning.
Parameter Description
Parameter
SDCCH Verification
TCH Verification
5-50
Description
Service verification results of a commissioned GBTS.
Automatic fault diagnosis results of a commissioned GBTS.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3900 Series Multi-Mode Base Station
Description
If the value is not 0, you can infer that the
counter meets the requirement.
If the value is not 0, you can infer that the
counter meets the requirement.
Commissioning Guide
Issue 02 (2010-07-30)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents