Table 6-4 Status - Huawei 3900 Series Commissioning Manual

Multi-mode base station
Hide thumbs Also See for 3900 Series:
Table of Contents

Advertisement

6 Commissioning the MBTS by Using USB and M2000
Step 2 When the LED on the USB disk is blinking, the GBTS loads the version and parses the
configuration file and saves it to the flash memory of the GBTS.
Do not remove the USB disk during this period. Otherwise, the file parsing fails.
Step 3 Check and ensure that the GBTS configuration is successful, as shown in

Table 6-4 Status

Plug the USB disk
into the USB port and
detect the USB disk
automatically.
The GTMU
downloads the
software and data
configuration file
from the USB disk.
The GTMU
downloads the
software and data
configuration file
from the USB disk.
The GTMU activates
the software.
The GTMU resets.
The GTMU is
running properly.
The BTS configuration is successful when the following phenomena continue over a minute:
l
l
The BTS configuration fails if any of the following phenomena occurs:
l
6-14
CAUTION
Status of the LED
on the USB Disk
ON
Blinking
Blinking
ON
ON first, OFF for a
while, and then ON
ON
The LED on the USB disk is ON.
The RUN LED on the GTMU blinks slowly.
After the USB disk is inserted, the RUN LED on the GTMU blinks slowly, and the LED on
the USB disk is ON.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3900 Series Multi-Mode Base Station
State of the RUN
LED on the GTMU
Blinking (on for 1s
and off for 1s)
Blinking (ON for
0.125s and OFF for
0.125s)
Blinking (ON for
0.125s and OFF for
0.125s)
Blinking (ON for
0.125s and OFF for
0.125s)
ON first, OFF for a
while, and then ON
Blinking (on for 1s
and off for 1s)
Commissioning Guide
Table
6-4.
Duration
About 1s to 2s
About 8 minutes
About 10s
About 3 to 4 minutes
About 2 minutes
-
Issue 02 (2010-07-30)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents