5 Commissioning the MBTS in GL or UL Mode on the
M2000

Figure 5-4 Set Stepsdialog box

4.
5.
Step 4 Check whether the imported self-configuration data and the ESN reported by the eNodeB are
automatically bound.
5-12
Set the commissioning steps and then click OK. The Import dialog box is displayed.
NOTE
If the eNodeB software and data configuration are already upgraded to the target version through the USB
storage device on site, click Advanced when importing the EDS file on the M2000, and then clear the
DownloadSoftware, DownloadData, and ActSoftware check boxes in the displayed Set Steps dialog
box. In this case, these cleared steps are skipped in the automatic eNodeB commissioning.
Click OK to import the EDS file. The basic configuration information about each new
eNodeB is displayed in the eNodeB Auto Deployment tab page.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3900 Series Multi-Mode Base Station
Commissioning Guide
Issue 02 (2010-07-30)