3900 Series Multi-Mode Base Station
Commissioning Guide
Figure 7-13 Site Configuration dialog box (1)
Step 2 Click Site0, and then click Add Subobject. In the Object Attributes area, specify Object
No. and Object Name.
In the Object Operation area, Cell0 is added, as shown in
Issue 02 (2010-07-30)
7 Commissioning the MBTS by Using Local Maintenance
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Terminal and M2000
Figure
7-14.
7-17