BTS3900(A) GSM
Commissioning Guide
8
This describes the data sheet that is used to record the process and result of the BTS
commissioning.
Table 8-1 Data sheet for BTS commissioning
Site Name
BTS Model
Commissioning
Time
Commissioning
Engineer
Scenario
Commissioning
Result
Commissioning Item
Commissioning
Preparation Phase
Commis
sioning
Phase
Issue 02 (2009-04-20)
Commissioning Record Data Sheet
□ Transmission available scenario □ Transmission unavailable
scenario
□ Successful □ Failed
The resources required for
commissioning are available.
The commissioning
requirements are met.
Transmis
You have logged in to the BTS
sion
through the SMT.
Unavaila
The BTS board and logical
ble Phase
objects are available.
The current software version is
correct.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Commissioning Record Data Sheet
Conclusion
Handling
Exceptional Case
8-1