Checking Indicators - Huawei OceanStor N8500 T Series Installation Manual

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
Step 4 Press the power button on either controller A or controller B of an SUC.
Wait about three minutes for the power indicator to be green on.
After the power button is pressed on the SUC, the SUD connected to the SUC is concurrently
powered on.
Step 5 Optional: Applicable to a configuration of multiple SUCs and SUDs, please repeat
power them on.
Step 6 After SUCs and SUDs are powered on, press buttons on clustered NAS engine enclosures to
power them on.
Wait about five minutes for the power indicator to be green on.
Power indicator
----End
Follow-up Procedure
At the completion of device power-on, learn about the device indicator status by referring to

7.24 Checking Indicators

indicator is red on, contact Huawei technical support engineers.
7.24 Checking Indicators
After the N8500 is powered on, view indicators on the N8500 to determine whether the entire
system is properly operating.
Checking Indicators on a clustered NAS engine enclosure
Figure 7-36
Issue 02 (2015-09-22)
and determine whether the N8500 is running properly. If any
shows indicators on the front and rear panels of the clustered NAS engine enclosure.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 N8500 Installation (with S5600T, S5800T or S6800T
Storage System as the Storage Unit)
Power button
Step 4
to
219

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents