Huawei OceanStor N8500 T Series Installation Manual page 178

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
l
l
l
Procedure
Step 1 Install the left adjustable guide rail (with an L identifier).
1.
2.
Issue 02 (2015-09-22)
Guide rails can be flexibly adjusted from 600 mm to 900 mm, and installed in the cabinet
with a depth from 800 mm to 1200 mm.
Adjustable guide rails come preinstalled with square-hole positioning pins. If required,
change square-hole positioning pins to round-hole ones before installing adjustable guide
rails.
NOTE
You can find round-hole positioning pins in the accessory bag delivered with storage devices.
Four M6 screws are used to secure adjustable guide rails.
locations.
Figure 7-2 Screw hole locations
NOTE
If there is no scale marked on the channels, mark the scale from the bottom 1 U position upwards. Be sure
to horizontally line up the front and rear of the adjustable guide rail.
Align the underside of the adjustable guide rail with the desired U position on the front and
rear channels.
Extend the adjustable guide rail until the front and rear positioning pins protrude through
the holes on the front and rear channels.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 N8500 Installation (with S5600T, S5800T or S6800T
Storage System as the Storage Unit)
Figure 7-2
shows the screw hole
169

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents