Huawei OceanStor N8500 T Series Installation Manual page 120

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
l
l
l
l
l
Context
Stacking storage devices will damage devices; therefore, storage devices must be placed on
adjustable guide rails.
l
l
l
l
l
Issue 02 (2015-09-22)
Phillips screwdriver (M3 to M6)
Marker pen
M6 screws
Square-hole positioning pin (matching square holes on channels)
Round-hole positioning pins (matching round holes on channels)
CAUTION
Each SUD is equipped with a pair of adjustable guide rails.
Guide rails can be flexibly adjusted from 600 mm to 900 mm, and installed in the cabinet
with a depth from 800 mm to 1200 mm.
Adjustable guide rails come preinstalled with square-hole positioning pins. If required,
change square-hole positioning pins to round-hole ones before installing adjustable guide
rails.
NOTE
You can find the round-hole positioning pins in the accessory bag delivered with storage devices.
Three M6 screws are used to secure the adjustable guide rails delivered with a 2 U SUD.
Figure 6-7
shows locations of the three M6 screws.
Figure 6-7 Securing adjustable guide rails
Four M6 screws are used to secure the adjustable guide rails delivered with a 4 U SUD.
Figure 6-8
shows locations of the four M6 screws.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 N8500 Installation (with S5500T Storage System as the
Storage Unit)
111