Powering On The N8500 - Huawei OceanStor N8500 T Series Installation Manual

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
2.
3.
4.
Step 3 Route and bundle cables.
----End

6.23 Powering On the N8500

This section explains how to power on the N8500 after it is installed and cabled.
Prerequisites
Before powering on the N8500, ensure that:
l
l
l
Issue 02 (2015-09-22)
Figure 6-34 Using a buckle to secure the AC power cable
Open the buckle, as shown in step 2 in
Lock the buckle towards the joint between the AC power cable and socket and secure the
AC power cable to the socket, as shown in step 3 in
NOTE
Before fully closing the buckle, slide the buckle to a proper position where the power cable can be
tightly secured.
Repeat
Step 1
to
Step 2
NOTE
For details on how to route and bundle serial cables or management network cables, see
Routing Description
and
All components have been properly installed and cabled.
The switch of PDU or PDB has been switched to Off.
The power voltage conforms to device requirements.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 N8500 Installation (with S5500T Storage System as the
Figure
for other power cables.
13 Basic Cable Routing and Bundling
6-34.
Figure
6-34.
Technology.
Storage Unit)
12 General Cable
148

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents