The pipeline from the pressure sensor to the meter must be laid in a falling
manner so that, where applicable, water cannot damage the pressure sensor or
influence the measurement precision.
6.2

Connection

The EK205-M is available in various equipment variants. Information about this can
be found at www.elster-instromet.com.
DANGER!
Risk of explosion by connection to non-intrinsically-safe and associated
equipment.
When operating the EK205-M in an area at risk of explosion (zones 2) and
connecting devices without certification as an "associated piece of equipment", there
is a risk of explosion.
Therefore:
– When used in an area at risk of explosion, connect the EK205-M to certified,
associated pieces of equipment only in accordance with the valid rules of the art
stated in the design test certificates.
– Connect the EK205-M only to intrinsically safe pieces of equipment whose electric
data correspond to the requirements stated in the design test certificates of the
EK205-M (see section 13.3).
WARNING!
Risk from faulty connection of the device!
The connection of the device may be carried out by a gas expert only (see section
Safety). Faults in this process may result in fatal situations or considerable material
damage.
Therefore:
– Have the connection of the calibrated device be carried out by a gas expert only.
– Also involve this person for subsequent relocations.
– Do not perform any connection changes or relocations of the device
independently.
During connection and commissioning of the EK205-M, observe the requirements of the
associated norms DIN EN 60079-0 and DIN EN 60079-14.
Have the wiring of the connections carried out correctly by a gas expert or a calibration
officer.
Do not connect active outputs against each other and ensure that they have the correct
polarity in advance.
Seal unused cable glands as described in DIN EN 60079-14 using a plug or a suitable
screw-in cover to maintain the required IP protection class (see section 4.1).
Insulate any unused wire (e.g., in multicore cables) at the end by appropriate termination
means. (see "Technische Regel für Betriebssicherheit (TRBS)")
Installation, connection and commissioning