Cisco Nexus 7000 Hardware Installation And Reference Manual page 87

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Chapter 3
Installing a Cisco Nexus 7009 Chassis
Figure 3-14
1
Cable management frame.
2
Front-mount bracket.
Repeat Step 1 to attach a cable management frame to the right side of the chassis.
Step 2
Place the top hood (part number 800-33785-01) on top of the two cable management frames that are
Step 3
already installed. Push the top hood toward the chassis so that its alignment pins enter the alignment
holes and the top hood rests against the chassis as shown in
OL-23069-07
Attaching a Cable Management Frame to a Front-Mount Bracket
3
4
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Installing the Cable Management Frames
Position the frame so that the two lower hooks on the
front-mount bracket fit inside the two holes on the
frame and then slide the assembly down so that it is
held by the hooks.
Loosely fasten the assembly to the front-mount bracket
with four M4x10 screws. Do not tighten these screws.
Figure
3-15.
3-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents