Repacking the System Components
Figure E-19
1
Coil the power cables and place them on the
bottom of the opened box.
2
Place the trifold cover over the coiled cables. 7
3
Place the power supply unit in its ESD bag
and hold the filler box outside the bag in the
notched portion of the power supply unit.
4
Place the nonexpanding end pad over the back
end of the power supply unit and filler box.
5
Pull the two sides of the expandable end pad
apart, fit the end pad over the front of the
power supply unit, and press the two sides
together snuggly over the front of the power
supply unit.
Fold the trifold cover at its seams and place it over the coiled power cables (see Callout 2 in
b.
Figure
Loosen the four captive screws on the power supply unit so that they no longer connect with the
c.
chassis.
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
E-34
Packing a 6-kW DC Power Supply Unit in a Single-Unit Box
E-19).
Appendix E
Repacking the Cisco Nexus 7000 Series Switch for Shipment
6
Place the padded power supply unit inside the
box and on top of the trifold.
Fold the narrow flaps over the power supply
unit pads.
8
Fold the wide flaps over the power supply
unit.
9
Tape the wide flaps together and to the box
with packing tape.
OL-23069-07