Attention: You can only install the server successfully when the rails are fully extended.
Rack front
Figure 23. Pulling out the rails
Step 2.
Carefully lift up the server with three people.
CAUTION:
Make sure three people are lifting the sever by holding the lift points.
Rack front
Figure 24. Lifting up the server
Lift point
1
Step 3.
From the front of the rack, install the server into the rails.
.
Chapter 5
Hardware replacement procedures
67