Installing A Battery; Installation Procedure - Mitsubishi Electric MELSEC iQ-R Series User Manual

Process cpu module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4.2

Installing a Battery

Install a battery to the CPU module.

Installation procedure

Q6BAT
The connector plug of the Q6BAT is disconnected from the jack of the CPU module before shipment. To use the battery,
connect the connector plug of the Q6BAT and the jack of the CPU module by following the procedure below.
(2)
(3)
■Precautions
• When using the CPU module with the battery removed, check that the jack (3) of the CPU module is inserted in the socket
on the battery cover located on the bottom of the CPU module.
• Do not drop or apply strong shock to the module and the battery.
4 START-UP PROCEDURE
38
4.2 Installing a Battery
1.
Open the battery cover located on the bottom of the CPU module.
2.
Check that the Q6BAT (1) is correctly installed.
3.
Check the direction and securely insert the connector plug (2) of the Q6BAT to the
jack (3) of the CPU module.
(1)
4.
Close the battery cover.