How To Set And Add A Ups5000-E - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Path
3.
----End

8.1.6.3 How to Set and Add a UPS5000-E?

Prerequisites
Procedure
Step 1 Set the UPS5000-E monitoring parameters.
1.
2.
3.
Issue 06 (2020-04-22)
Parameter
Name
Device Address
Click Test Connect to check whether the UPS2000-G connects to the ECC800-Pro
properly.
If the UPS2000-G connects to the ECC800-Pro properly, click Confirm. The
connected devices are displayed in the Number of connected devices list.
If the UPS2000-G does not connect to the ECC800-Pro properly, check whether the
cable between the UPS2000-G and the ECC800-Pro is connected properly, whether
the UPS2000-G and ECC800-Pro are running properly, and whether the input
parameters are consistent with the UPS2000-G parameters.
The section describes how to add a UPS2000-G in a single UPS scenario. In a parallel UPS scenario, if
the common communications address of the Modbus card is added to the ECC800-Pro, all UPS2000-Gs
can be connected to the ECC800-Pro.
One end of the straight-through cable has been connected to the RS485 port on the
UPS5000-E monitoring module, and the other end has been connected to the COM port
on the ETH converter.
When connecting devices, you are advised to add devices one by one and ensure that the
view is consistent with the real object. If all devices have been added and powered on,
only the BLINK function of the ETH converter can be used to identify the mapping
between the UPS5000-E and ETH converter.
On the displayed screen after UPS5000-E startup, tap System Info.
Choose System Info > Settings, enter the user name admin and password 000001, and
tap
.
Tap Communication and set RS485 baud rate to 9600, and RS485 address to 1 on the
displayed communication settings screen.
Copyright © Huawei Technologies Co., Ltd.
Setting
UPS2000-G is connected to another port, enter the
number of the connected port.
In this example, Device Address is set to 1. During
actual configuration, set the device address for the
UPS2000-G based on the actual situation.
8 FAQ
228

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800-pro

Table of Contents